C2 rebuild now underway (more pics)
C2 rebuild now underway (more pics)
Couple more pics.
You do not have the required permissions to view the files attached to this post.
-
- Heavy Smoker
- Posts: 407
- Joined: Sat Jun 27, 2015 10:51 am
Re: C2 rebuild now underway (more pics)
Lovely work mate....
- Top-shaggy
- Premix Junkie
- Posts: 1966
- Joined: Mon Oct 31, 2011 11:09 pm
- Location: Derbyshire
Re: C2 rebuild now underway (more pics)
It's going to look better than new at this rate
If it takes more than 2strokes then your just playing at it..
- 500bernie
- Avgas Sniffer
- Posts: 3398
- Joined: Mon Aug 02, 2010 10:22 am
- Location: Teesside
Re: C2 rebuild now underway (more pics)
That looks great =D> =D> =D>
The callipers look fantastic, what finish is that on them?
The probolts really finish it off.
Well done. Can't wait to see what the finished bike will look like.
Cheers
Bernie
The callipers look fantastic, what finish is that on them?
The probolts really finish it off.
Well done. Can't wait to see what the finished bike will look like.
Cheers
Bernie
Firecracker Red and Grey C3 300
Re: C2 rebuild now underway (more pics)
Standard Suzuki finish, spent a while finding some nice nick ones but worth looking. Bolts are Ti ones off eBay. Calipers are so light compared to std although had to add a washer to centre them on the discs.
Next jobs are rear mudgaurd, fit the clocks and exhaust bracket then clean the powder off the mounts and get the motor in. Shims at the ready...
Next jobs are rear mudgaurd, fit the clocks and exhaust bracket then clean the powder off the mounts and get the motor in. Shims at the ready...
-
- Heavy Smoker
- Posts: 420
- Joined: Fri Sep 19, 2014 6:44 pm
- Location: South Manchester
Re: C2 rebuild now underway (more pics)
smoovly wrote:Standard Suzuki finish, spent a while finding some nice nick ones but worth looking. Bolts are Ti ones off eBay. Calipers are so light compared to std although had to add a washer to centre them on the discs.
I used some of these http://www.ebay.co.uk/itm/ZXR400-ZXR750 ... SwpDdU465T
Re: C2 rebuild now underway (more pics)
Snap. But, still didn't quite line up as well as I would have liked. Should be ok with a washer, it's only the brakes so nothing too critical.
Re: C2 rebuild now underway (more pics)
First lot of plating is back so at last I can start to put some bits on. Typical fab finish from Collins.
You do not have the required permissions to view the files attached to this post.
Re: C2 rebuild now underway (more pics)
I've got some clear stuff being done next week so will post some pics of that too when it comes back plus some pics of the bike with some of it bolted on.
Pads & hoses ordered, Wiseco pistons coming soon then it's off with the barrels. Bank balance emptying at a shocking rate but I knew that was going to happen....
Pads & hoses ordered, Wiseco pistons coming soon then it's off with the barrels. Bank balance emptying at a shocking rate but I knew that was going to happen....
You do not have the required permissions to view the files attached to this post.
-
- Oil Injector
- Posts: 706
- Joined: Sun Sep 30, 2007 5:59 pm
Re: C2 rebuild now underway (more pics)
That looks good, never had any 'blacking' done before, it's either been zinc or yellow so far, whats the spring off? don't remember removing one of them, I'm just putting mine together too.
-
- Oil Injector
- Posts: 800
- Joined: Mon Nov 05, 2007 4:19 pm
- Location: london
Re: C2 rebuild now underway (more pics)
I think that the spring is a guard that goes between the rear brake master cylinder and the reservoir, it looks like the one on my kr-1.
Re: C2 rebuild now underway (more pics)
Yep, it goes on the hose from the reservoir to the master cylinder.
Re: C2 rebuild now underway (more pics)
Made tons of progress over the last few weeks.
Barrels have been to Aptec and Wiseco pistons from Jarno installed. Standard pipes have been painted and all zincing is done. Need some offset clamps for the JL cans, Tyga ones look like they will do the trick. Still looking for that elusive horn bracket and need to make a clutch cable loop for the clock bracket and get that re-coated. Was happy with it but now the clutch cable is on I see that it really needs it. KIPS system all sorted, went with the original valves as not too badly grooved, new seals, aftermarket rods and pattern cables. It's nice and smooth and hopefully won't leak.
Should be ready to fire it up in a few weeks once I can find my wife's spare hairdryer to get the airbox on.
Barrels have been to Aptec and Wiseco pistons from Jarno installed. Standard pipes have been painted and all zincing is done. Need some offset clamps for the JL cans, Tyga ones look like they will do the trick. Still looking for that elusive horn bracket and need to make a clutch cable loop for the clock bracket and get that re-coated. Was happy with it but now the clutch cable is on I see that it really needs it. KIPS system all sorted, went with the original valves as not too badly grooved, new seals, aftermarket rods and pattern cables. It's nice and smooth and hopefully won't leak.
Should be ready to fire it up in a few weeks once I can find my wife's spare hairdryer to get the airbox on.
You do not have the required permissions to view the files attached to this post.
Re: C2 rebuild now underway (more pics)
More pics.
You do not have the required permissions to view the files attached to this post.