Due to the time of year (cold) - progress has been a bit slow
First thing i did was get the cracked engine mount welded on the KR1S frame

One of the engines was seized but complete - stripped the top end off and it was the crank which was solid (good
news in a way)
The other engine had a seized crank with no top end
I had this spare bottom end sitting in my shed

Gave it a bit of a clean

I mated this with the top end and loosely assembled a mock bike in the KR1 frame to see what it sounded like - and whether i needed to do any major work/spending before taking things further.


Fitted minimal electrics and fuelling just to get it running and no nasty noises. I had overflowing carbs problem
which didn't help but nothing which can't be fixed.
Now i know the basics are okay i can get on with the build. I won't be throwing money at it. Just fixing what
needs doing and cleaning up with the intention of making a reliable

I intend to keep the reverse black/green paint scheme already on the bodywork
Weather seems to be picking up so should be able to make some good progress soon