1st job to store the big bits, fairings & pipes and make the bike move able with a dry fit.
Wheels came off and the various spacers found and then reinstalled. No major probs. Brakes on and calipers positioned. As expected the calipers have seized up. A refresh is on the way
On the shelf (well the loft) I had a freshly built crank and some 250 wosner pistons. The 250cc barrels are a bit sloppy so they have gone off for a replate
Plan is
Dry build everything before I drop the engine. That should highlight what bits I have spare/missing/broken.
Once the replated 250cc barrels are back I will drop the engine and rebuild it with the new crank. I might pop a BDK F3 Kips system in whilst it's apart. With the engine out I can get the frame welded.
Then the existing crank and 300 kit will be up for sale.
Rebuild it, MOT it, Thrash it

Pics (maybe) to follow