Final KR Based Race Bike Project
-
- Oil Injector
- Posts: 877
- Joined: Mon Sep 07, 2009 8:33 pm
- Location: east yorkshire
Re: Final KR Based Race Bike Project
I wish i'd done that before getting mine re-plated. I know for future now lol. Glad you have it in hand pal.
Dan
Dan
-
- Premix Junkie
- Posts: 1329
- Joined: Tue Jul 25, 2006 7:44 pm
- Location: Middle England
Re: Final KR Based Race Bike Project
Remember if you brace (weld) the barrel it will distort (amount of distortion will depend on whether barrel and brace were pre-heated before welding). The barrel (crankcase side) will need to be skimmed to get it level again. Should only require 0.1 to 0.2 mm but will put your port timing and squish out requiring a thicker base gasket to bring things back.
-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
Yes Mark is correct, the welds pull the base a small amount, so the bases do require skimming. Barrels are away again at my engineers being worked.
-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
Nothing exciting, just tidied the throttle cables up with some ferrules.


-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
Water pump also arrived, so I've made a start on attaching the coolant hoses. Need to wait until the head arrives before I can finish this job though.




-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
Brake hose on, exhaust fabrication scheduled for Friday


-
- Oil Injector
- Posts: 926
- Joined: Sat Mar 22, 2008 5:42 pm
- Location: retford n,nott`s working in cotswolds
- Contact:
Re: Final KR Based Race Bike Project
hope you cut of the mount for the drain pipes ,or do you need that lug ?
-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
No I was going to ask the file to take a look at it Fred
-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
Made a little more progress with my exhausts today, everything is really slow going at the moment.


- Binetta Steve
- Oil Injector
- Posts: 949
- Joined: Sat Nov 10, 2012 6:13 pm
- Location: North Wales
Re: Final KR Based Race Bike Project
Ben if i woke up from a wet dream and thought exhausts! They would look like yours.
Brilliant, just as Bernie drops off the polishing, you pop up with engineering innovation.
Steve
Brilliant, just as Bernie drops off the polishing, you pop up with engineering innovation.
Steve
-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
Thanks Steve, I'm trying. The polishing will start when the engineering finishes 

-
- Premix Junkie
- Posts: 1328
- Joined: Fri Apr 18, 2008 8:25 am
- Location: Solihull
Re: Final KR Based Race Bike Project
Hi Ben,
Some fantastic quality work there Ben.
BUT the radio really caught my eye
Cheers
Andrew
Some fantastic quality work there Ben.
BUT the radio really caught my eye

Cheers
Andrew
Luders wrote:Made a little more progress with my exhausts today, everything is really slow going at the moment.
GWB KR1s C2 - Now gone 
GWB KR1 - YES IT'S DONE!
ZXR400L PROJECT
AND NO S****Y H****A'S
Usque Ad Mortem Bibendum

GWB KR1 - YES IT'S DONE!
ZXR400L PROJECT

AND NO S****Y H****A'S
Usque Ad Mortem Bibendum
-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
That radio isn't mine, it might be older than me... 



- Top-shaggy
- Premix Junkie
- Posts: 1966
- Joined: Mon Oct 31, 2011 11:09 pm
- Location: Derbyshire
Re: Final KR Based Race Bike Project
That expansion chamber looks nice and tight under the bike
)

If it takes more than 2strokes then your just playing at it..
-
- Avgas Sniffer
- Posts: 3926
- Joined: Fri Jun 18, 2010 11:29 am
- Location: Oxfordshire
Re: Final KR Based Race Bike Project
Those are the lomas pipes Shaun. I just stuck them on to see how it looked, as my custom pipes won't be finished until August. Just got too much else on at the moment to work on them.